AT A GLANCE

The practical answer.

Request the released drawing and electrical data for the exact cell, plus any separate finished-pack documents needed for the project. Compare model, document version and test conditions across the files before accepting them as one evidence package.

Stacked silver pouch assembly with folded tabs and a visible seam
Jetray LiPo family photo. No thickness, pressure limit or service-life result is established by this image.

Separate the released cell drawing from the pack drawing

Request the current cell outline with datum, thickness measurement conditions, terminal positions, tab material and seal keep-outs where applicable. If buying a pack, request a separate assembly drawing showing the completed harness, connector and protective electronics relevant to the host. A cell drawing cannot confirm fit of a finished battery assembly.

Document review register for a selected pouch design

Document review register for a selected pouch design
RecordIdentifier to checkDecision owner
Released cell outlineCell model, drawing revision, datum, tab positions and seal zonesMechanical engineer checks packaging fit.
Electrical data sheetCell version, test conditions and allowed charging and discharge windowsElectrical engineer checks actual use profile.
Finished assembly recordPack model, connector and wire revisions, protection configuration and documented changesPack and host teams resolve interface deviations.
Transport or other reportsExact design identified in the document, revision, issuing party and stated scopeResponsible quality or shipping owner determines applicability.
Manufacturing equipment and assembly stations in a Jetray workshop
Application-planning reference. Photograph from Jetray's manufacturing collection, used to illustrate the production context.

Read test conditions beside the specification

Check whether reported capacity is a typical value or a guaranteed minimum, and record the relevant temperature, discharge conditions and cutoff. Confirm the allowed charge and discharge windows for the exact product. A family page can help locate a candidate, but a specification decision depends on controlled files that match its revision.

Reconcile revisions across documents before approval

Keep a register with part number, revision, date, file owner and superseded versions. Confirm whether the protective circuit, terminal or interconnect changed between sample and production records. Require the responsible reviewer to close unresolved matches before using the evidence to approve the build.

Keep shipment scope with the exact design

When required, review a lithium battery test summary against the design offered for transport. Do not assume a cell-level file establishes evidence for a separate finished-pack design. Keep transport documentation, application validation and any market conformity evidence in their own rows, with responsibility and scope stated.

CONTINUE WITH THE PRODUCT DETAILS

References to explore.

Review the published reference and its integration questions. A similar voltage, format or application label does not establish compatibility.

APPLY THE DECISION

Plan the application.

Sources & further reading

Prepared for the lithium polymer batteries collection. General engineering guidance does not replace a model-specific datasheet or application validation. Source review: 9 November 2026.